

This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". The cookie is used to store the user consent for the cookies in the category "Other. The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". The cookie is used to store the user consent for the cookies in the category "Analytics". These cookies ensure basic functionalities and security features of the website, anonymously. Necessary cookies are absolutely essential for the website to function properly. The installation process is shown in detail on this page –.Any other type of floor covering (tiles, VCT, etc.) can be installed after 16 hours. However, if the surface is colored using a dyes or stains or any other concrete micro-topping ( Skraffino) or covered with epoxy or polyurethane resin coatings or simply sealed with acrylic, epoxy and polyurethane sealers, we recommend waiting for at least 24 hours. Protect for up to 24 hours after completed installation. Turn off all forced ventilation and radiant heating systems. Protect the poured Param 5500 from excessive heat or draft conditions during the curing process.
CONCRETE OVERLAY ON WOOD INSTALL
Install at no less than 3/8” thickness over the highest point in the floor. Mix for at least 3 minutes with a heavy duty drill mixer (minimum 750rpm) to obtain a lump-free mix. For each bag, add 5.0 quarts of cool, potable water. It is mixed in 2-bag batches at one time. Overlap adjacent pieces of lath mesh approximately 2”. Install 3.4 galvanized, expanded diamond metal lath mesh to the wood subfloor, stapling approximately 6 inches to prevent the mesh from floating. Allow the primer to dry to a thin, slightly tacky film (min.When applying with a pump sprayer, make sure to cover the substrate with an even coat to ensure proper penetration and follow immediately behind to work into the surface with a push broom. The primer solution should be distributed evenly over the floor surface and then brushed into the substrate with a soft bristled push broom.

CONCRETE OVERLAY ON WOOD FREE
The surface of the wood must be clean and free of oil, grease, wax, dirt, varnish, shellac, or any contaminant that might act as a bond breaker. Any boards exhibiting movement should be renailed. The subfloor should be solid and fixed securely to provide a rigid base.
CONCRETE OVERLAY ON WOOD CRACK
Traditional latex-modified or gypsum based underlayments will crack along joints, break bond with lateral wood movement, and often strong enough to withstand the traffic. The joints between boards and rough uneven surfaces become pronounced. The daily temperature and humidity changes cause the wood floors to move and expand under stress. Sealers and Topcoats for Concrete Floorsĭuring renovation and remodeling of existing buildings, more and more people are looking for ways to convert their existing wood or plywood sub floors into concrete floors.Shop Wall, Ceiling, and Floor Epoxy Coating.Concrete Overlay Products for Exterior and Interiors.Industrial Epoxy Primer, Concrete Primer, & More.Concrete Microtoppings / Skim coats (interior).Concrete Microtoppings (interior / exterior).Industrial Epoxy Primer, Concrete Primer, & More Primer coats used in the installation of concrete coatings and decorative concrete overlays.Prepare a concrete substrate for the installation of concrete coatings and decorative concrete overlays. All Surface Preparation Surface preparation products for concrete floors.
